Challenges & Solutions
1 CHALLENGE ONE
Accelerating site survey and documentation to close land deal.
OUR SOLUTION
The client’s building revisions needed to be rushed to ensure the updated configuration would get approved. Our team did a complete site survey and redesign in 36 hrs to ensure the land sale could be closed on time.
2 CHALLENGE TWO
Unexpected location challenges demanded we work as partners with design team.
OUR SOLUTION
New location requirements required us to provide a “drop everything” in-depth analysis to address new design needs. To expedite and approve construction drawings we contributed updated design recommendations with minimal implications, which were welcomed whole heartedly by the design team.
1 CHALLENGE ONE
Completing project on-time despite “red-tape” delays.
OUR SOLUTION
Anticipating final project approval, we presented a “Construction Management” type contract and a Class B budget within 10 days. This meant that all the pricing did not need to be in place before starting the project, which accelerated the completion timeline. We completed the project 4 days ahead of schedule, and came in at 4% under the Class B budget.
“Carnahan Construction quotes are incredibly transparent - granular level details and pricing. They offered us options to reflect different costing and turnaround times - and let us choose the best path forward.”
“Jason and the team identified each speedbump as it came into view. Providing us with not just one solution, but a detailed list of options and recommendations. ”
“On time, on budget was amazing - but it never would have happened without the upfront work CPM puts into understanding and questioning aspects of the build.”
“Their focus on analyzing the project first really opened our eyes. Without a doubt, things would have been missed without their honesty them and commitment to details.”